The Claremont Group

our solutions

  • Auditing
  • Certification/Commissioning
  • Software Programming
  • Business/Technical Training
  • Web/Database Development

Place du Portage 8B1 Lights at Place du Portage 8B1

In 2006, The Claremont Group was contracted to assist with a demonstration of personal environmental controls at Place du Portage Phase III 8B1 in Gatineau Quebec. We oversaw the installation and commissioned a fully functional BACnet system for 19 workstations in the space.

PWGSC's Place Du Portage Phase III 8B1 PEC site features a system consisting of 3 main components:

1) User interface

2) Lighting controller

3) HVAC temperature/flow controller

cubicle setup at PWGSC air nozzle

Pictured above, Sensors detect user presence while Air Nozzles are used to supply a stream of repositional air to the individual workstations. This allows the user to adjust the temperature of their own space, typically an 8X10 cubical.

Claremont produced a PowerPoint presentation on techincal issues involved with setting up PWGSC's Place du Portage site. Download the pdf file now. More..